Starting the installation
The drywall has been cut to allow for the installation of WaterGuard.
Before we begin
There was an issue with water in this area in the past. We will remove the floor and install a Lateral Line to collect the water and drain it to our system.
Almost finished
In this photo you can see that the floor has been cut and the WaterGuard and TripleSafe have put in place. The next step here is to concrete over this area.
Lateral Line Installation
Here the floor has been cut and the line has been laid. The finishing touch will be to lay the new concrete on top.
WaterGuard and TripleSafe installed
Here you can see that we are finished installing the WaterGuard around the perimeter of the basement as well as the TripleSafe sump pump system. Once the new concrete has cured, the flooring can be reinstalled in this space.
Lateral Line is complete
Here is the line is complete and will not collect any water from this area and drain it to the TripleSafe System.
Lateral line connecting to WaterGuard system
This is there area where the lateral line and perimeter water control system meet.